Pineapples Custom Tiling

Tile, Ceramic, Mosaic, Natural and MFG Stone · Prosser, WA · License #PINEACT811DA

Active

State-verifiedWhat does verified mean?
  • State-verified Checked against WA L&I records, updated daily.
  • Owner-verified The business claimed this listing and verified ownership — free. Claim this listing
  • Proven on Subser The business runs real jobs through Subser — measured performance, not reviews.

License facts

License type
CONSTRUCTION CONTRACTOR
Effective date
Mar 1, 2019
Expiration date
Mar 25, 2028
UBI
604404992
Business type
Individual
Phone
(509) 948-2673
Location
Prosser, WA 99350

Source: WA L&I contractor registration — verified Aug 12, 2026. Applies to every row above.

Is this your business? Update your info and take booking requests.

Claim this free listing

Bond & insurance on file

Bond firmAmountEffectiveExpiration
Nationwide Mutual Ins Co$15,000Mar 20, 2026Continuous — until canceled
Nationwide Mutual Ins Co$15,000Jul 1, 2024Canceled May 13, 2025
Nationwide Mutual Ins Co$6,000Mar 1, 2019Jul 1, 2024
Insurance companyAmountAgencyEffectiveExpiration
NATIONWIDE ASSURANCE COMPANY$1,000,000Feb 27, 2026Feb 27, 2027
What the bond and insurance requirements mean for homeowners

Washington requires specialty contractors to file a $15,000 surety bond with the Department of Labor & Industries as a condition of registration ($30,000 for general contractors). This contractor's current filing shows a $15,000 bond.

The bond is a limited fund a homeowner (or subcontractor or supplier) can make a claim against, through the courts, if a registered contractor fails to meet its obligations on a job. Contractors must also keep general liability insurance on file — at least $50,000 in property damage and $200,000 in public liability coverage, or a $250,000 combined single limit — which covers damage the contractor causes, not workmanship disputes. The rows above are the bond and insurance filings L&I publishes for this registration; whether a specific filing applies to a specific project depends on its dates and terms.

Principals

NameStart date
Nicholas Guadalupe PinaMar 1, 2019
Delara M Hernandez PinaMar 25, 2026
What is a Tile, Ceramic, Mosaic, Natural and MFG Stone contractor licensed to do in Washington?

This specialty registration covers installing tile, ceramic, mosaic, and natural or manufactured stone — floors, walls, showers, backsplashes, and similar surfaces. The registration is limited to this trade. The registration requires a $15,000 surety bond and general liability insurance on file with WA L&I.

Browse the directory

Built from Washington State L&I public records, updated Aug 12, 2026. No star ratings or reviews — verification only.